Document Description |
Due Date |
SOW |
|
2 October 2006 |
PDR |
|
20 November 2006 |
CDR |
|
22 January 2007 |
FRR |
|
19 March 2007 |
FR |
- Final Report (experiment results and flight report)
NOTE: Because of the limited access to
the necessary lab equipment and shortage of chemicals, the
final step of the experiment analysis had to be postponed
until mid-late September. The final report will be updated
and posted as soon as the results are available.
|
25 May 2007 |
|
| |